HMHEFENGModular
Menu
Commercial double-wing modular building prepared for project use

B2B Project Orders · MOQ 5 Units

Modular buildings planned for real project delivery.

HEFENG Modular supports contractors and project owners with configurable buildings for workforce accommodation, construction camps, site offices and remote facilities.

Construction contractors
EPC companies
Mining and remote-site operators
Energy and infrastructure projects

Custom layouts

Factory production

Export packing

Installation support

Modular building systems

Select the system around the project.

The right configuration starts with the site, intended use, required quantity, internal layout and transport plan—not a one-size-fits-all retail package.

White double-wing folding modular house

Expandable Double-Wing Houses

20 ft, 30 ft and 40 ft reference models with selectable room layouts for project use.

Folding container modular building unit

Flat-Pack & Folding Containers

Compact folding units for temporary accommodation, offices, storage and project support spaces.

Apple cabin modular building

Space Capsules & Apple Cabins

Specialty modular cabins with distinctive exterior forms and integrated interior packages.

Saudi Arabia & Middle East projects

Plan the unit around the destination—not only the floor plan.

HEFENG Modular can review commercial building configurations for contractors and project owners serving Saudi Arabia and the wider Middle East. Final compliance and engineering responsibilities are confirmed for each destination and project scope.

Operating environment

Review temperature exposure, dust, occupancy and required HVAC allowances with the project engineering team.

Destination standards

Confirm electrical supply, socket format, utilities, fire strategy and local approval responsibilities before production.

Transport planning

Check unit dimensions, shipment condition, destination port, inland route, unloading equipment and site access.

Local works

Define surveys, foundations, permits, utility connections, lifting, labor and installation supervision in the supply boundary.

Finished interior of a modular accommodation unit

Project applications

Spaces configured around operations and people.

01

Workforce accommodation

Sleeping units, washroom modules and shared living facilities.

02

Construction camps

Project offices, meeting rooms, dining, laundry and support buildings.

03

Remote project facilities

Modular spaces planned for transport, site assembly and phased expansion.

04

Commercial modular spaces

Reception, retail, hospitality and temporary operational facilities.

Project workflow

From requirement definition to shipment coordination.

Every quotation should define the product configuration, customer responsibilities, supply scope and delivery interfaces.

  1. 01

    Project brief

    Location, application, quantity, layout, utilities and delivery schedule.

  2. 02

    Configuration

    Unit type, room plan, materials, electrical standard and supply boundary.

  3. 03

    Production coordination

    Manufacturing sequence, inspection points, packing and loading plan.

  4. 04

    Export delivery support

    Shipment documents, installation information and agreed technical support.

Project review package

What project buyers can review before an order.

A qualified modular building enquiry should result in a documented scope that procurement, engineering and site teams can review together.

01

Configuration schedule

Unit models, quantities, room uses, finishes and optional equipment recorded for commercial review.

02

Layout and interface drawings

Agreed room arrangements, openings, utility points and relevant site interfaces prepared for confirmation.

03

Production and inspection scope

Manufacturing responsibilities, agreed inspection points and acceptance documents defined before production.

04

Packing and installation documents

Loading information, packing scope and available installation guidance coordinated for the delivery plan.

Frequently asked questions

Early answers for commercial project buyers.

What is the minimum order quantity?

HEFENG Modular handles B2B project orders with a standard minimum order of five units. The final quantity and building mix are reviewed against the application and delivery plan.

Can HEFENG Modular help prepare a camp layout?

Yes. Layout coordination can begin after the project location, population, room schedule, shared facilities, utilities and development phases are defined.

Which modular building systems are available?

The current range includes double-wing folding houses, folding container units, quick-assembly buildings, mobile restrooms and specialty modular spaces.

Can units be configured for Saudi Arabia and Middle East projects?

Project configurations can be reviewed for the destination, intended use and operating conditions. Electrical standards, insulation, HVAC allowances and local compliance responsibilities must be confirmed for each project.

Is installation support available?

Remote guidance or an agreed on-site support scope can be reviewed where applicable. Local labor, lifting, civil works, permits and site safety responsibilities must be defined in the proposal.

Commercial enquiries only

Share the project location, quantity and intended application.

Prepare Project Brief